Resources
FAQs
Latest News
Project Events
Document Library
FAQs
The New South Wales (NSW) Government has granted Critical State Significant Infrastructure (CSSI) status to Project EnergyConnect (PEC). “PEC is a very important part of Australia’s energy future,”...
Read more
The TransGrid Project EnergyConnect team were excited to visit Wentworth for the 134 th Wentworth Show over the weekend of 24-25 August 2019. The Show was a great opportunity for the team to meet...
Read more
Recently, the Australian Energy Market Operator (AEMO) released a report highlighting that additional power resources are needed to meet summer peaks. AEMO outlines that “…the acceleration of...
Read more
ElectraNet and TransGrid recently joined a host of industry experts at the 2019 Clean Energy Summit, in Sydney, where a common theme for discussion was the need to build new transmission lines and...
Read more
ElectraNet has been advised that the Commonwealth Department of the Environment and Energy (DoEE) has determined the South Australian component of Project EnergyConnect is to be a “Controlled...
Read more